🏗️
PieceMark
·
Danny's Construction Company — One Beverly Hills
👤 Set name
●
Erection Progress
All pieces on this plan, by role, with how many are actually erected.
Current List
0 pieces — tap pieces on the drawing to add them
Pending (Sent, Awaiting Erection)
Tap a piece name for bolts/notes. Use "Couldn't Erect" if it fails in the field.
Bolts Progress
Tap a beam once its bolts are snapped/torqued to check it off. Tap again to undo.
Plumb Progress
Tap a column to enter its out-of-plumb readings.
Welding Progress
Moment connections found on EC204 (from AWS weld symbols). Tap a connection to check it off once welded.
Block / Segment Key Plan
CP-3 — Shop Order Break Out, One Beverly Hills Podium Area C
Receiving Batches
Every load received so far, grouped by reference number.
Related RFIs & Field Orders
Bolt Connections
Notes
Shop Drawing
Not available yet — will appear here once shop drawings are added.